under construction · stage 5 of 7

Bengaluru Suburban Rail Project

K-RIDE · 149.348 km, 64 stations across four corridors: Sampige (Corridor 1), Mallige (Corridor 2), Parijaata (Corridor 3), Kanaka (Corridor 4) Also called BSRP, Sampige Line, Mallige Line, Parijaata Line, Kanaka Line.

Latest cost
₹15,767 cr

sanctioned, Oct 2020

Last checked
19 Sept 2026

re-checked every quarter

Not on record yet: original deadline, current deadline. Missing data is shown, not guessed.

What's pending

As of a 2025-06-30 status update (The Metro Rail Guy): 0 km operational, 54.9 km under construction, 94.4 km approved but not yet started, out of 149.348 km total. Originally targeted for completion in 2026; more recent reporting suggests this deadline has slipped, but this site has not yet located a primary source confirming a specific revised date, so no current_deadline is recorded.

History

  1. announced

    ₹18,621 cr whole project [1]

    Funder: centre · FY 2019-20

    Context

    Earlier proposed estimate, before the Ministry of Railways requested the state revise it downward

  2. Sanctioned

    Central Government approved BSRP construction at a reduced cost of ₹15,767 crore, down from an earlier ₹18,621 crore estimate, with coach procurement shifted to a PPP leasing model. [1]

  3. sanctioned

    ₹15,767 cr whole project [1]

    Funder: centre · FY 2020-21

    Context

    Approved by the Central Government/Ministry of Railways; coach procurement shifted to a PPP leasing model as part of the reduction from the earlier ₹18,621 cr estimate

  4. Sanctioned

    KfW Development Bank signed a €500 million (₹4,552 crore) loan agreement, plus a €4.5 million grant, with K-RIDE to finance Corridors 1 and 3. [2]

  5. sanctioned

    ₹4,552 cr Part figure: KfW loan for Corridors 1 and 3 only [2]

    Funder: external · FY 2023-24

    Context

    KfW Development Bank loan (€500 million) for Corridors 1 & 3 civil and systems works; KfW also provided a separate €4.5 million (~₹41 cr) grant, not included in this figure

Sanctioned, released and spent are different things: an allocation is not evidence money was spent. Part figures cover one contract, loan or package and are never used as the project's cost.

Sources

medium confidence This page is based on news reports or an agency's own report, not yet an official document.

  1. Finance Ministry Clears Revised Rs 15,767 cr Bengaluru Suburban Rail Project, 306 AC Coaches To Be Leased Via PPP ModeSwarajya · news
  2. KfW Bank signs €500 million loan deal with K-RIDE for Bengaluru Suburban Rail ProjectUrban Transport News · news
Notes and caveats

First K-RIDE record on this site. Corporation set to Central as a placeholder — the four corridors radiate outward across the city; not yet mapped to wards. sanction_date is month-level precision only ("October 2020"), exact day not confirmed. Foundation stone was laid 2023-06-20 by the Prime Minister — noted here rather than as a formal event, since "foundation stone laid" does not fit any type in this site's event schema. The project was first conceived in 1983 and reworked over decades; that pre-2020 history is not yet documented here with dated, sourced figures.