complete · stage 7 of 7

Green Line extension: Nagasandra – Madavar

BMRCL · 3.03 km northern extension of the Green Line, part of Namma Metro Phase 2 Also called Green Line Madavara extension.

Latest cost
₹298 cr

revised cost, Nov 2024

Last checked
20 Sept 2026

re-checked every quarter

Not on record yet: sanction date, original deadline. Missing data is shown, not guessed.

History

  1. Section opened

    Nagasandra–Madavar extension became operational. [1]

  2. revised cost

    ₹298 cr whole project [2]

    Funder: state · FY 2024-25

    Context

    Total construction cost as reported at opening. Other reporting found in this collection pass gives different figures for what may be different scope (a ₹247.41 cr civil contract to Simplex Infrastructure Limited, awarded ~February 2017; a separate ₹1,168 cr figure including ₹152 cr land acquisition) — neither of those two was independently confirmed against a fetchable source, so only this ₹298 cr figure is recorded; see project notes.

Sanctioned, released and spent are different things: an allocation is not evidence money was spent.

Sources

medium confidence This page is based on news reports or an agency's own report, not yet an official document.

  1. Bangalore Metro Phase 2: Route Map, Status Update & TendersThe Metro Rail Guy · news
  2. Bangalore Metro: Green Line's Nagasandra-Madavara Stretch Becomes OperationalMetro Rail News · news
Notes and caveats

Became operational 2024-11-07, per The Metro Rail Guy and independently per Metro Rail News. Cost reporting conflicts across sources: ₹298 cr (Metro Rail News, at opening — recorded here), a separate ₹247.41 cr civil contract to Simplex Infrastructure Limited awarded ~February 2017, and a ₹1,168 cr figure including ₹152 cr land acquisition (both from unconfirmed secondary reporting, not recorded as figures). These may describe different scopes (one contract package vs. total project vs. total including land) rather than a true conflict, but this has not been resolved.

Report an error